Roof slates and fixtures removal for restoration
The works include the removal and safe on site storage of roof slates and fixtures for the restoration of the former Bournville Baths.
Works also included demolition of a boiler room, roof demolition and internal demolition and strip out works. Access to the majority of the roof strip and internal works were gained via full working scaffold and crash decking.
Work included:
- PBM acting as sub-contractor
- Soft stripping
- Internal demolition
- Hand demolition
- Demolition
- Diesel tank removal